Finishing Site

I got all the loose ends of the planning site squared away so that I can show it to others. The only remaining problem is that the image across the top doesn't display properly.

Posted on Tue, 30 Oct 2007 Tags:

Management and Cleanup

I finished the project management plan and sent it off for comment and fixed various problems caused by the Zope upgrade.

Posted on Mon, 29 Oct 2007 Tags:

Moving Forward

I got the first cut of the project management plan done and put it on the wiki. I updated the project wik page as well. I also installed the new version of the par with Greg and checked it over.

Posted on Fri, 26 Oct 2007 Tags:

Requirements

I spent most of today working on the requirements for the LDAP Email project. There were unicode problems with the Zope wikis related to the version upgrade. I fixed a wiki with problems that Lynn reported.

Posted on Thu, 25 Oct 2007 Tags:

Not Feeling Well

But still managed to do some work on the requirements document and the planning site.

Posted on Wed, 24 Oct 2007 Tags:

Threefold

In the morning I worked on the planning site, in the afternoon on the requirements for the email ldaap integration project, and in the late afternoon, I restored the divas to their proper branch and manager.

Posted on Tue, 23 Oct 2007 Tags:

Directory Assistance

Robin had issues with the ldap directory in Zope. I had tried to fix them earlier, but there still were problems. So today I think I got the problem fixed. I also fixed the remaining problems with my cron jobs (caused by move from ubik) and worked some more on the itsd planning site.

Posted on Mon, 22 Oct 2007 Tags:

Son of Site

I worked all day on redoing the planning site. It's mostly done, but I have to track down all the documents they want.

Posted on Fri, 19 Oct 2007 Tags:

Planning Site

Mostly worked on revising the planning site according to Marty's and Dorris's requests.

Posted on Thu, 18 Oct 2007 Tags:

Report Revision

More cron job failures because of ubik going away. I hope I fixed them. I revised the report script, tested it, and then was told that was not what was wanted. So I revised the online ldap directory command instead. I compared the RAM Cache code in Zope 2.7 and 2.10 and there are no significant differences. I also stared at the code and couldn't see that it did what people tell me it does, namely, punt modified files from the cache.

Posted on Wed, 17 Oct 2007 Tags: